Devlog: pace and next run

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
2026-11-13 18:06:03 -05:00
co-authored by Claude Opus 5.5
parent b8791e5ce2
commit fdd4c992c3
+9
View File
@@ -1029,3 +1029,12 @@ high-priority issues, and A3, A7, A12 and A13 deferred.
- The sea surface is flat: swell is in the normals and foam only, because the mesh is too coarse to displace.
- No caustics or lightning.
- Real GPU cost of the rain and shader is unmeasured (H1 and R6).
**Pace (end of this run, 18:05 ET Friday):**
- v0.6 has A1, A2, A4, A6, A8, A9, A10 and A11 done. A5 (world art) is its last high-priority issue. A3, A7, A12 and A13 stay deferred.
- That's still more than a day behind: v0.6 was due on the night of 11-12, and about 62 hours remain to Monday 08:00.
- v0.9 and R1 to R5 haven't started.
**Next run:**
- Start R1 (the Linux export pipeline) alongside A5. A runnable package matters more for Monday than more art. The previous entry already said to start it if v0.6 was still open now.
- Then A5, then the type/bug issues in v0.9: H9 (the boathook doesn't hurt players), H11 (canopies filling the camera) and H13.